Princeton High School

  • 2-precast

The project consists of a 20,000 SF gymnasium / Entryway / Office / Bathroom addition utilizing precast and block/brick cavity walls on CMU Foundations and slab on grade. Interior finishes include: wood gym flooring, VCT, Acoustical Panels, Gym Equipment, Tile Bathrooms. The project also includes a 7,500 SF classroom / IT addition with a  lower level to provide ADA access to the schools basement. This addition utilizes concrete footings, CMU foundations / LL walls, and block / brick cavity walls. Interior finishes include VCT and carpet Flooring with ACT ceilings. 3,200 SF of the existing building will also be remodeled to provide a more secured entrance and kitchen remodel.