Demo of an existing office and dental building on top of a precast tuck under garage. Construction of a new 3 tenant 8,700 SF retail building and associated site improvements. The construction is a combination of structural block and steel framed with steel stud infill over a CMU foundation with concrete footings. The exterior finish consists of aluminum storefront, stone veneer, and EIFS.